How to Prepare for Lead Removal in NYC: Property Owner's Guide

Proper preparation makes lead abatement faster, cheaper, and less disruptive. According to DeLead NYC, well-prepared projects finish 20-30% faster than unprepared ones. Here's your complete preparation checklist.

Notify tenants in writing about the scheduled work. Coordinate access times. Arrange temporary relocation if needed. Confirm your contractor's start date and scope.

Move or cover furniture in affected rooms (your contractor may do this, but check). Clear closets and shelves near work areas. Remove curtains and blinds from windows being abated. Secure valuables and electronics.

Confirm access arrangements with tenants and building management. Clear a path from the building entrance to the work area for equipment. Identify the nearest water source and electrical outlet for the crew.

Ensure the unit is accessible at the scheduled start time. Keep children and pets away from the work area. Provide the crew with any building-specific information (elevator access, loading dock, etc.).

Stay out of the containment area. Keep windows closed in adjacent rooms to prevent dust migration. The crew will communicate progress and any unexpected findings.

Wait for clearance testing results before re-entering the work area. Review the clearance report. DeLead NYC handles all HPD filing — you don't need to do anything further. Learn about the complete removal process.

Pack personal items into sealed bags or move them out of work areas. Photograph existing conditions. Confirm tenant relocation arrangements. Notify the building super and neighbors. Verify the contractor's EPA RRP cert and NYC DEP lead license are current.

1 Week Before

2-3 Days Before

Day Before

Day Of

During the Work

After the Work